RGCM » GTI Hoist : Hoist Hire, Operation & Management
RG Birmingham the square
Project Information
Clients:
RGCM
Date:
June 2022 – August 2023
Address:
The Square, Birmingham
GTI Hoist Ltd have a 3 year framework agreement with the RG Group, one of their current projects is based at The Square, Birmingham (see picture of site) GTI Hoist Ltd hired and installed 3 rack and pinionhoist to the RG Group for the build.
  1. Twin Alimak Scando 650 passenger/goods machine, 2500kgand 24 passengers per machine.
  2. Geda 3700zzp-3700kg3.
  3. Geda 1500zzp–2000kg
The twin Alimak Scando 650 hoist serves 35 floors(100 metres), loading out the floors with equipment and people. The hoist is based on a podium and is fed by the Geda 3700zzp. The smaller hoist Geda 1500zzp is installed on a smaller block.GTI Hoist Ltd engineers, install, service and maintain the hoists, and attend breakdowns within 24 hours to prevent loss of site production. The project is due to be completed in August 2023. GTI Hoist Ltd engineers will remove the hoists, and ship them back to the GTI Hoist Ltd base in Peterborough where they will be refurbished in readiness for the next projects.